Project status
Completed
Location
Kooragang, NSW
Client
ARTC
Start Date
Oct 2011
Completion Date
Jul 2012

The purpose of the project was to provide infrastructure to increase the rail capacity of the Kooragang Coal Terminal (KCT) by providing the ability to hold 6 trains ahead of the Kooragang Dump Stations.

The project also provides:
a) Reduced congestion on the wider rail network; and
b) Enhanced operational flexibility for KCT and thereby the wider network.

Scope of supply:

  • Design and supply of multiple AS60kg tangential turnouts
  • Design and supply of concrete bearers
  • Design and supply of explosively hardened manganese monoblock crossing with flash butt welded rail legs
  • Design and supply of D84M points operation rodding including Spherolock