The purpose of the project was to provide infrastructure to increase the rail capacity of the Kooragang Coal Terminal (KCT) by providing the ability to hold 6 trains ahead of the Kooragang Dump Stations.
The project also provides:
a) Reduced congestion on the wider rail network; and
b) Enhanced operational flexibility for KCT and thereby the wider network.
Scope of supply:
- Design and supply of multiple AS60kg tangential turnouts
- Design and supply of concrete bearers
- Design and supply of explosively hardened manganese monoblock crossing with flash butt welded rail legs
- Design and supply of D84M points operation rodding including Spherolock